OWNER:

SeaWorld San Diego


PROJECT:

1,000 sqft


COMPLETED:

2001

This project at SeaWorld San Diego included modifications to the existing pool at dolphin stadium to incorporate the dolphin interaction program. Ledges were provided to allow the guests to get in the water with a trainer and interact with the dolphins.