OWNER:

City of Sausalito


PROJECT:

19,900 sqft


COST:

$10,262,126


COMPLETED:

August 2010

 

Located on two adjacent sites in the city of Sausalito, this project simultaneously designs, to LEED Gold criteria, both a Fire Station and a Police Station to serve the City’s growing needs. The project was completed in August 2010 and was certified by the USGBC at LEED Gold level.

The 11,800 sf, two-story Fire Station facility includes two double-deep, drive-thru apparatus bays and two single, deep-back apparatus bays, all with a vehicle exhaust system; administrative offices; radio communications room, EOC / training room; exercise room; dayroom; kitchen; five dorm rooms; and men’s and women’s locker / shower rooms

The 8,100 sf, two-story Police Station facility includes administrative offices, radio room, patrol and briefing rooms, evidence, booking, sallyport, investigation, exercise room, and men’s and women’s locker / shower rooms.