OWNER:
United States Navy
PROJECT:
30,000 sqft
COST:
$11.5 Million
COMPLETED:
January 2004
This Design-Build project included the design and preparation of construction documents including specifications and construction administration services. The project involved the design of a new Range Operations Center for the Naval Warfare Center at Point Mugu, CA. The 30,000 s.f. facility includes a Operations Control Room which is used to monitor and test missile activity from multiple locations across the western US. The project included extensive design of secure communications systems. The design was developed in a manner to allow construction activities to proceed adjacent to the existing operational facility, without effecting on-going operations.